Author: Trahern, G.
Paper Title Page
FRCAUST03 Status of the ESS Control System 1345
 
  • G. Trahern
    ESS, Lund, Sweden
 
  The European Spallation Source (ESS) is a high current proton LINAC to be built in Lund, Sweden. The LINAC delivers 5 MW of power to the target at 2500 MeV, with a nominal current of 50 mA. It is designed to include the ability to upgrade the LINAC to a higher power of 7.5 MW at a fixed energy of 2500 MeV. The Accelerator Design Update (ADU) collaboration of mainly European institutions will deliver a Technical Design Report at the end of 2012. First protons are expected in 2018, and first neutrons in 2019. The ESS will be constructed by a number of geographically dispersed institutions which means that a considerable part of control system integration will potentially be performed off-site. To mitigate this organizational risk, significant effort will be put into standardization of hardware, software, and development procedures early in the project. We have named the main result of this standardization the Control Box concept. The ESS will use EPICS, and will build on the positive distributed development experiences of SNS and ITER. Current state of control system design and key decisions are presented in the paper as well as immediate challenges and proposed solutions.
From PAC 2011 article
http://eval.esss.lu.se/cgi-bin/public/DocDB/ShowDocument?docid=45
From IPAC 2010 article
http://eval.esss.lu.se/cgi-bin/public/DocDB/ShowDocument?docid=26
 
slides icon Slides FRCAUST03 [1.944 MB]