Keyword: extraction
Paper Title Other Keywords Page
S04SRS05 Beam Extraction Controlsystems of the Fast-Cycling Synchrotron controls, synchrotron, operation, target 174
 
  • A. Toumanian, A. Kazarian, N. Khoetsian, N. Zapolski
    YerPhI, Yerevan, Armenia
 
  A compact system controlling the extraction of different beams (gamma, electron, synchrotron radiation) in single and simultaneous operation modes at high electromagnetic disturbances level based on using one computer of IBM PC/AT type is described.  
DOI • reference for this paper ※ doi:10.18429/JACoW-ICALEPCS1991-S04SRS05  
About • Received ※ 11 November 1991 — Accepted ※ 20 November 1991 — Issued ※ 04 December 1992  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
S04SRS08 VME Computer Monitoring System of KEK-PS Fast Pulsed Magnet Currents and Beam Intensities booster, kicker, injection, septum 184
 
  • T. Kawakubo, A. Akiyama, T. Ishida, E. Kadokura
    KEK, Ibaraki, Japan
  • T. Ishida
    Mitsubishi Electric Corporation, Tokyo, Japan
 
  For beam transfer from the KEK-PS Linac to the Booster synchrotron ring and from the Booster to the Main ring, many pulse magnets have been installed. It is very important for the machine operation to monitor the firing time, rising time and peak value of the pulsed magnet currents. It is also very important for magnet tuning to obtain good injection efficiency of the Booster and the Main ring, and to observe the last circulating bunched beam in the Booster as well as the first circulating in the Main. These magnet currents and beam intensity signals are digitized by a digital oscilloscope with signal multiplexers, and then shown on a graphic display screen of the console via a VME computer.  
DOI • reference for this paper ※ doi:10.18429/JACoW-ICALEPCS1991-S04SRS08  
About • Received ※ 11 November 1991 — Accepted ※ 20 November 1991 — Issued ※ 04 December 1992  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)