Paper |
Title |
Page |
S02SRU07 |
Upgrading the BEPC Control System |
82 |
|
- L.P. Yang, L.Z. Wang, S.-Y. Liu
IHEP, Beijing, People’s Republic of China
|
|
|
The BEPC control system has been put into operation and operated normally since the end of 1987. Three years’s experience shows this system can satisfy basically the operation requirements, also exhibits some disadvantages a raised from the original centralized system architecture based on the VAX-VCC-CAMAC, such as slow response, bottle neck of VCC, less CPU power for control etc. This paper describes the method and procedure for upgrading the BEPC control system which will be based on DECnet and DEC-WS, and thus intend to upgrade the control system architecture from the centralized to the distributed and improve the integral system performance.
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-ICALEPCS1991-S02SRU07
|
|
About • |
Received ※ 11 November 1991 — Accepted ※ 20 November 1991 — Issued ※ 04 December 1992 |
|
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
S04SRS06 |
Instrumentation & Control System For PLS-IM-T 60 MeV LINAC |
177 |
|
- D.K. Liu, K.R. Yei, H.J. Cheng, L.P. Yang, C.Z. Chuang, W. Yue, P. Lu, Y.H. Su, Q. Lin, H. Huang
IHEP, Beijing, People’s Republic of China
|
|
|
The PLS/ MT is a 60 MeV LINAC as a preinjector for 2 GeV LINAC of PLS project. The instrumentation and control system have been designed under the institutional collaboration between the IHEP (Beijing, China) and POSTECH (Pohang, Korea). So far, the I&C system are being set up nowadays at the POSTECH of Pohang. This paper describes its major characteristics and present status.
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-ICALEPCS1991-S04SRS06
|
|
About • |
Received ※ 11 November 1991 — Accepted ※ 20 November 1991 — Issued ※ 04 December 1992 |
|
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|