S02SRU07 Upgrading the BEPC Control System 82
 
  • L.P. Yang, L.Z. Wang, S.-Y. Liu
    IHEP, Beijing, People’s Republic of China
 
  The BEPC control system has been put into operation and operated normally since the end of 1987. Three years’s experience shows this system can satisfy basically the operation requirements, also exhibits some disadvantages a raised from the original centralized system architecture based on the VAX-VCC-CAMAC, such as slow response, bottle neck of VCC, less CPU power for control etc. This paper describes the method and procedure for upgrading the BEPC control system which will be based on DECnet and DEC-WS, and thus intend to upgrade the control system architecture from the centralized to the distributed and improve the integral system performance.  
DOI • reference for this paper ※ doi:10.18429/JACoW-ICALEPCS1991-S02SRU07  
About • Received ※ 11 November 1991 — Accepted ※ 20 November 1991 — Issued ※ 04 December 1992  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)