Author: Cavallari, G.
Paper Title Page
S04SRS01 Digital Control of the Superconducting Cavities for the LEP Energy Upgrade 159
 
  • G. Cavallari, E. Ciapala
    CERN, Meyrin, Switzerland
 
  The superconducting (SC) cavities for the LEP200 energy upgrade will be installed in units of 16 as for the present copper cavity system. Similar equipment will be used for RF power generation and distribution, for the low level RF system and for digital control. The SC cavities and their associated equipment however require different interface hardware and new control software. To simplify routine operation control of the SC cavity units is made to resemble as closely as possible that of the existing units. Specific controls for the SC cavities at the equipment level, the facilities available and the integration of the SC cavity units into the LEP RF control system are described.  
DOI • reference for this paper ※ doi:10.18429/JACoW-ICALEPCS1991-S04SRS01  
About • Received ※ 11 November 1991 — Accepted ※ 20 November 1991 — Issued ※ 04 December 1992  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)