JACoW logo

Journals of Accelerator Conferences Website (JACoW)

JACoW is a publisher in Geneva, Switzerland that publishes the proceedings of accelerator conferences held around the world by an international collaboration of editors.


BiBTeX citation export for S20PD02: Summary of Panel Discussion on Standards and World-Wide Sharing of Software

@inproceedings{lucas:icalepcs1991-s20pd02,
  author       = {P.W. Lucas and C.I. Briegel and P.N. Clout and D.P. Gurd and N. Kanaya and U. Raich},
  title        = {{Summary of Panel Discussion on Standards and World-Wide Sharing of Software}},
% booktitle    = {Proc. ICALEPCS'91},
  booktitle    = {Proc. 3rd Int. Conf. Accel. Large Exp. Phys. Control Syst. (ICALEPCS'91)},
  eventdate    = {1991-11-11/1991-11-15},
  pages        = {597--597},
  paper        = {S20PD02},
  language     = {english},
  keywords     = {controls, software, network, database, hardware},
  venue        = {Tsukuba, Japan},
  series       = {International Conference on Accelerator and Large Experimental Physics Control Systems},
  number       = {3},
  publisher    = {JACoW Publishing, Geneva, Switzerland},
  month        = {12},
  year         = {1992},
  issn         = {2226-0358},
  isbn         = {978-3-95450-254-7},
  doi          = {10.18429/JACoW-ICALEPCS1991-S20PD02},
  url          = {https://jacow.org/icalepcs1991/papers/s20pd02.pdf},
  abstract     = {{It has been a dream in the accelerator community for some time that software developed for one control system be easily transferable to and usable at another. Until recently this goal was seldom realized in practice. This has been primarily because the various control systems have been developed inhouse with little standardization among them. The world of accelerators was dominated until a few years ago by very large machines constructed for doing high energy physics. The large laboratories could likewise afford large controls groups, which were able to build these complete systems from the ground up. However the accelerator scene has now shifted, with a large fraction of the new work being done at much smaller installations, installations which cannot afford the large staffs previously employed in control system production. Different approaches to this problem were outlined in the discussion.}},
}