JACoW logo

Journals of Accelerator Conferences Website (JACoW)

JACoW is a publisher in Geneva, Switzerland that publishes the proceedings of accelerator conferences held around the world by an international collaboration of editors.


BiBTeX citation export for S02SRU06: Upgrading the Control System for the Accelerators at The Svedberg Laboratory

@inproceedings{gajewski:icalepcs1991-s02sru06,
  author       = {K.J. Gajewski and O. Johansson and L. Thuresson},
  title        = {{Upgrading the Control System for the Accelerators at The Svedberg Laboratory}},
% booktitle    = {Proc. ICALEPCS'91},
  booktitle    = {Proc. 3rd Int. Conf. Accel. Large Exp. Phys. Control Syst. (ICALEPCS'91)},
  eventdate    = {1991-11-11/1991-11-15},
  pages        = {78--81},
  paper        = {S02SRU06},
  language     = {english},
  keywords     = {controls, cyclotron, interface, hardware, software},
  venue        = {Tsukuba, Japan},
  series       = {International Conference on Accelerator and Large Experimental Physics Control Systems},
  number       = {3},
  publisher    = {JACoW Publishing, Geneva, Switzerland},
  month        = {12},
  year         = {1992},
  issn         = {2226-0358},
  isbn         = {978-3-95450-254-7},
  doi          = {10.18429/JACoW-ICALEPCS1991-S02SRU06},
  url          = {https://jacow.org/icalepcs1991/papers/s02sru06.pdf},
  abstract     = {{Two accelerators at The Svedberg Laboratory in Uppsala, the Gustaf Werner cyclotron and the CELSIUS ring, will get a new control system. At present both the cyclotron and the ring have their own control systems based on S99 and PDP11 minicomputers respectively. There are also a number of subsystems which are controlled separately from the standalone PC based consoles (ECR ion source, electron cooler, vacuum system). The goal of the rejuvenation is to integrate all existing control systems and provide the new system with an uniform operators interface based on workstations. The obsolete S99 microcomputers will be substituted with a VME system and all subsystems will be connected to the Ethernet. The upgrade strategy enabling the transformation of the system without any long shut-down period is discussed. Hardware and software planned for the upgrade is presented together with a discussion of expected problems.}},
}