A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Bishop, D.

Paper Title Page
TPPB34 ISAC Control System Update 235
 
  • D. Bishop, D. Dale, T. Howland, H. Hui, K. Langton, M. LeRoss, R. B. Nussbaumer, C. G. Payne, K. Pelzer, J. E. Richards, W. Roberts, E. Tikhomolov, G. Waters, R. Keitel
    TRIUMF, Vancouver
 
  At the ISAC radioactive beam facility, the superconducting Linac was commissioned, and several experimental beam lines were added. The paper will describe the additions to the EPICS-based control system, issues with integration of third-party systems, as well as integration of accelerator controls with experiment controls.