Author: Justus, M.
Paper Title Page
WEP043 Upgrade of the ELBE Timing System 446
 
  • M. Kuntzsch, M. Justus, A. Schwarz, K. Zenker
    HZDR, Dresden, Germany
  • L. Krmpotić, U. Legat, Ž. Oven, L. Perusko, U. Rojec
    Cosylab, Ljubljana, Slovenia
 
  The CW electron accelerator ELBE is in operation for more than two decades. The timing system has been patched several times in order to meet changing requirements. In 2019 the development of a new timing system based on Micro Research Finland Hardware has been started which is designed to unify the heterogeneous structure and to replace obsolete components. In spring 2023 the development of the software has been accomplished, which included the mapping of operation mode and different complex beam patterns onto the capabilities of the commercial platform. The system generates complex beam patterns from single pulse, to macro pulse and 26 MHz cw operation including special triggers for diagnostics and machine subsystems. The contribution will describe the path from requirements to development and commissioning of the new timing system at ELBE.  
DOI • reference for this paper ※ doi:10.18429/JACoW-IBIC2023-WEP043  
About • Received ※ 06 September 2023 — Revised ※ 11 September 2023 — Accepted ※ 13 September 2023 — Issue date ※ 01 October 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)