JACoW logo

Journals of Accelerator Conferences Website (JACoW)

JACoW is a publisher in Geneva, Switzerland that publishes the proceedings of accelerator conferences held around the world by an international collaboration of editors.


BiBTeX citation export for TU3I01: Commissioning of the LCLS-II Machine Protection System for MHz CW Beams

@inproceedings{mock:ibic2023-tu3i01,
  author       = {J.A. Mock and A.S. Fisher and R.T. Herbst and P. Krejcik and L. Sapozhnikov},
  title        = {{Commissioning of the LCLS-II Machine Protection System for MHz CW Beams}},
% booktitle    = {Proc. IBIC'23},
  booktitle    = {Proc. 12th Int. Beam Instrum. Conf. (IBIC'23)},
  eventdate    = {2023-09-10/2023-09-14},
  pages        = {154--159},
  paper        = {TU3I01},
  language     = {english},
  keywords     = {timing, undulator, electron, linac, kicker},
  venue        = {Saskatoon, Canada},
  series       = {International Beam Instrumentation Conference},
  number       = {12},
  publisher    = {JACoW Publishing, Geneva, Switzerland},
  month        = {12},
  year         = {2023},
  issn         = {2673-5350},
  isbn         = {978-3-95450-236-3},
  doi          = {10.18429/JACoW-IBIC2023-TU3I01},
  url          = {https://jacow.org/ibic2023/papers/tu3i01.pdf},
  abstract     = {{Beam power at the LCLS-II linac and FEL can be as high as several hundered kW with CW beam rates up to 1 MHz. The new MPS has a latency of less than 100 µs to prevent damage when a fault or beam loss is detected. The MPS architecture encompasses the multiple FEL beamlines served by the SC linac and can mitigate a fault in one beamline without impacting the beam rate in a neighboring beamline. The MPS receives inputs from various devices including loss monitors and charge monitors as well as magnet power supplies and BPMs to pre-emptively turn of the beam if a fault condition is detected. Link nodes distributed around the facility gather the input data and stream it back to a central processor that signals other link nodes connected to beam rate control devices. Commmissioning and experience with the new system will be described.}},
}