JACoW logo

Joint Accelerator Conferences Website

The Joint Accelerator Conferences Website (JACoW) is an international collaboration that publishes the proceedings of accelerator conferences held around the world.


BiBTeX citation export for MOPP16: Current Status of Elettra 2.0 eBPM System

@inproceedings{brajnik:ibic2021-mopp16,
  author       = {G. Brajnik and M. Cargnelutti and R. De Monte and P. Leban and P. Paglovec and B. Repič},
  title        = {{Current Status of Elettra 2.0 eBPM System}},
  booktitle    = {Proc. IBIC'21},
  pages        = {71--74},
  eid          = {MOPP16},
  language     = {english},
  keywords     = {radiation, controls, FPGA, instrumentation, electron},
  venue        = {Pohang, Rep. of Korea},
  series       = {International Beam Instrumentation Conference},
  number       = {10},
  publisher    = {JACoW Publishing, Geneva, Switzerland},
  month        = {10},
  year         = {2021},
  issn         = {2673-5350},
  isbn         = {978-3-95450-230-1},
  doi          = {10.18429/JACoW-IBIC2021-MOPP16},
  url          = {https://jacow.org/ibic2021/papers/mopp16.pdf},
  note         = {https://doi.org/10.18429/JACoW-IBIC2021-MOPP16},
  abstract     = {{In the last years, there has been a growing interest in using the pilot-tone technique for long-term stabilization of electron beam position monitors in synchrotrons. At Elettra, after an internal development, the effectiveness of this approach was proven with tests in the laboratory and on the storage ring. The pilot-tone scheme will be adopted for the eBPMs that will equip Elettra 2.0, the low-emittance upgrade of the present machine. In order to support the development, industrialisation and production of the overall system, a partnership with Instrumentation Technologies has been signed. With the extensive experience with the Libera instruments, the company will be engaged in improving the BPM system developed by Elettra and getting it ready for serial production. This paper presents the current status of the BPM system, with an emphasis on the efforts done to improve the key performance of the system and to address its weaknesses (e.g. enhancing single bunch response and low currents sensitivity) within the industrialisation process, with the goal to get to a reliable system, easy to maintain and that meets the multiple project requirements for the new storage ring, the booster, the pre-injector and the transfer lines.}},
}