Title |
Beam Instrumentation Challenges for the Fermilab PIP-II Accelerator |
Authors |
- V.E. Scarpine, N. Eddy, D. Frolov, M.A. Ibrahim, L.R. Prost, R.M. Thurman-Keup
Fermilab, Batavia, Illinois, USA
|
Abstract |
Fermilab is undertaking the development of a new 800 MeV superconducting RF linac to replace it’s present normal conducting 400 MeV linac. The PIP-II linac warm front-end consists of an ion source, LEBT, RFQ and MEBT which includes an arbitrary pattern bunch chopper, to generate a 2.1 MeV, 2mA H⁻ beam. This is followed immediately by a series of superconducting RF cryomodules to produce a 800 MeV beam. Commissioning, operate and safety present challenges to the beam instrumentation. This paper describes these beam instrumentation challenges and the choices made for PIP-II.
|
Funding |
This work was supported by the U.S. Department of Energy under contract No. DE-AC02-07CH11359. |
Paper |
download MOPP034.PDF [1.324 MB / 3 pages] |
Poster |
download MOPP034_POSTER.PDF [0.999 MB] |
Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
Conference |
IBIC2019 |
Series |
International Beam Instrumentation Conferenc (8th) |
Location |
Malmö, Sweden |
Date |
08-12 September 2019 |
Publisher |
JACoW Publishing, Geneva, Switzerland |
Editorial Board |
Volker RW Schaa (GSI, Darmstadt, Germany); Andreas Jansson (ESS, Lund, Sweden); Thomas Shea (ESS, Lund, Sweden); Johan Olander (ESS, Lund, Sweden) |
Online ISBN |
978-3-95450-204-2 |
Online ISSN |
2673-5350 |
Received |
10 September 2019 |
Accepted |
11 September 2019 |
Issue Date |
10 November 2019 |
DOI |
doi:10.18429/JACoW-IBIC2019-MOPP034 |
Pages |
181-183 |
Copyright |
Published by JACoW Publishing under the terms of the Creative Commons Attribution 3.0 International license. Any further distribution of this work must maintain attribution to the author(s), the published article's title, publisher, and DOI. |
|