Author: Zeng, L.
Paper Title Page
MOOC02
The Beam Diagnostics in the CSNS Commissioning  
 
  • T.G. Xu, W.L. Huang, M. Meng, X.J. Nie, J.M. Tian, L. Zeng, D.H. Zhu
    IHEP, Beijing, People’s Republic of China
  • W.L. Huang, P. Li, X.J. Nie, J.L. Sun, A.X. Wang, T. Yang
    IHEP CSNS, Guangdong Province, People’s Republic of China
  • M. Meng
    DNSC, Dongguan, People’s Republic of China
 
  In June, 2017, the whole accelerator components were finished the installation work in the tunnel. Followed the installation, several different machine mode commissioning were carried out. The beam diagnostics were tested and used. The beam diagnostics performance and lessons were introduced in the paper.  
slides icon Slides MOOC02 [3.348 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)