Author: Pozdeyev, G.
Paper Title Page
MOOC01
Commissioning Results from FRIB  
 
  • G. Pozdeyev
    FRIB, East Lansing, USA
 
  Funding: Work supported by U.S. Department of Energy, Cooperative Agreement DE-SC0000661, and National Science Foundation, Cooperative Agreement PHY-1102511, State of Michigan and Michigan State University.
The FRIB Front End and the first three 0.041 cryomodules were successfully commissioned with Argon and Krypton beams. All required beam parameters at the end of the 0.041 cryomodules were reliably demonstrated and exceeded. Installed and commissioned accelerator systems demonstrated stable operation. In this talk, I’ll describe the status of FRIB commissioning and present commissioning results for the FRIB Front End and 0.041 cryomodules.
 
slides icon Slides MOOC01 [8.829 MB]  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)