Author: Klehr, F.
Paper Title Page
MOPA01 Status Overview of the HESR Beam Instrumentation 26
 
  • C. Böhme, A.J. Halama, V. Kamerdzhiev, F. Klehr, B. Klimczok, M. Maubach, S. Merzliakov, D. Prasuhn, R. Tölle
    FZJ, Jülich, Germany
 
  The High Energy Storage Ring (HESR), within the Facility for Antiproton and Ion Research (FAIR), will provide proton and anti-proton beams for PANDA (Proton Antiproton Annihilation at Darmstadt) and heavy ion beams for SPARC (Stored Particles Atomic Physics Research Collaboration). With the beam instrumentation devices envisaged in larger quantities, e.g. BPM and BLM being in production, other BI instruments like Viewer, Scraper, or Ionization Beam Profile Monitor are in the mechanical design phase. An overview of the status is presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IBIC2018-MOPA01  
About • paper received ※ 12 September 2018       paper accepted ※ 14 September 2018       issue date ※ 29 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)