Author: Iwabuchi, S.H.
Paper Title Page
MOOB01 Beam Commissioning of SuperKEKB Rings at Phase-2 6
 
  • M. Tobiyama, M. Arinaga, J.W. Flanagan, H. Fukuma, H. Ikeda, H. Ishii, S.H. Iwabuchi, G.M. Mitsuka, K. Mori, M. Tejima
    KEK, Ibaraki, Japan
  • G. Bonvicini
    Wayne State University, Detroit, Michigan, USA
  • E. Mulyani
    Sokendai, Ibaraki, Japan
  • G.S. Varner
    University of Hawaii, Honolulu,, USA
 
  The Phase 2 commissioning of SuperKEKB rings with Belle II detector began in Feb. 2018. Staring the commissioning of positron damping ring (DR), the injection and storage of the main rings (HER and LER) smoothly continued in Apr., 2018. The first collision has been achieved on 26th Apr. with the detuned optics (200 mm x 8 mm). Performance of beam instrumentation systems and the difficulties encountered during commissioning time will be shown.  
slides icon Slides MOOB01 [11.232 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IBIC2018-MOOB01  
About • paper received ※ 05 September 2018       paper accepted ※ 11 September 2018       issue date ※ 29 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
MOPA02 Beam Diagnostics for SuperKEKB Damping Ring in Phase-II Operation 29
 
  • H. Ikeda, M. Arinaga, J.W. Flanagan, H. Fukuma, H. Ishii, S.H. Iwabuchi, G.M. Mitsuka, K. Mori, M. Tejima, M. Tobiyama
    KEK, Ibaraki, Japan
 
  The SuperKEKB damping ring (DR) commissioning started in February 2018, before main ring (MR) Phase-II operation. We constructed the DR in order to deliver a low-emittance positron beam. The design luminosity of SuperKEKB is 40 times that of KEKB with high current and low emittance. A turn-by- turn beam position monitor (BPM), transverse feedback system, synchrotron radiation monitor (SRM), DCCT, loss monitor using ion chambers, bunch current monitor and tune meter were installed for beam diagnostics at the DR. An overview of the instrumentation and status will be presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IBIC2018-MOPA02  
About • paper received ※ 05 September 2018       paper accepted ※ 14 September 2018       issue date ※ 29 January 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)