Author: Tamura, F.
Paper Title Page
MOIPI1 1 MW J-PARC RCS Beam Operation and Further Beyond 1
 
  • H. Hotchi
    KEK, Tokai, Ibaraki, Japan
  • H. Harada, N. Hayashi, M. Kinsho, K. Okabe, P.K. Saha, Y. Shobuda, F. Tamura, K. Yamamoto, M. Yamamoto, M. Yoshimoto
    JAEA/J-PARC, Tokai-mura, Japan
 
  The J-PARC RCS have recently established a 1 MW beam operation with low fractional beam loss of the order of 10-3. In this talk, our approaches to beam loss issues that we faced in the course of beam power ramp-up are reviewed. Our recent efforts to further beam power ramp-up beyond 1 MW are also presented.  
slides icon Slides MOIPI1 [2.210 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-HB2021-MOIPI1  
About • Received ※ 04 October 2021 — Revised ※ 18 October 2021 — Accepted ※ 10 November 2021 — Issued ※ 22 November 2021
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THDC1 Slow Extraction Operation at J-PARC Main Ring 219
 
  • M. Tomizawa, Y. Arakaki, T. Kimura, S. Murasugi, R. Muto, H. Nishiguchi, K. Okamura, Y. Shirakabe, Y. Sugiyama, E. Yanaoka, M. Yoshii
    KEK, Ibaraki, Japan
  • K. Noguchi
    Kyushu University, Fukuoka, Japan
  • F. Tamura
    JAEA/J-PARC, Tokai-mura, Japan
 
  A high-intensity proton beam accelerated in the J-PARC main ring (MR) is slowly extracted by using the third integer resonance and delivered to the experimental hall. A critical issue in slow extraction (SX) is a beam loss caused during the extraction. A dynamic bump scheme under an achromatic condition provides extremely high extraction efficiency. We have encountered a beam instability in the debunch formation process, which is estimated to be triggered by a longitudinal microstructure of the beam. To suppress this instability, the beam to the MR has been injected into the RF bucket with a phase offset. A newly developed RF manipulation, 2-step voltage debunch, has successfully pushed up the beam power up to 64.6 kW keeping a high extraction efficiency of 99.5%. A drastic beam loss reduction has been demonstrated in the beam test using a diffuser installed upstream of the first electrostatic septum (ESS1). 8 GeV bunched slow extraction tests for the neutrino-less muon to electron conversion search experiment (COMET Phase-I) have been successfully conducted.  
DOI • reference for this paper ※ doi:10.18429/JACoW-HB2021-THDC1  
About • Received ※ 18 October 2021 — Revised ※ 22 October 2021 — Accepted ※ 22 November 2021 — Issued ※ 03 December 2021
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)