Paper | Title | Page |
---|---|---|
MOIPI1 | 1 MW J-PARC RCS Beam Operation and Further Beyond | 1 |
|
||
The J-PARC RCS have recently established a 1 MW beam operation with low fractional beam loss of the order of 10-3. In this talk, our approaches to beam loss issues that we faced in the course of beam power ramp-up are reviewed. Our recent efforts to further beam power ramp-up beyond 1 MW are also presented. | ||
![]() |
Slides MOIPI1 [2.210 MB] | |
DOI • | reference for this paper ※ doi:10.18429/JACoW-HB2021-MOIPI1 | |
About • | Received ※ 04 October 2021 — Revised ※ 18 October 2021 — Accepted ※ 10 November 2021 — Issued ※ 22 November 2021 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
FRPS5 |
Summary WG-E | |
|
||
Summary of the Working Group E (Beam Instrumentation and Beam Interaction) | ||
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |