DOI | Title |
---|---|
10.18429/JACoW-HB2018-TUA1WD03 | Commissioning Status and Plans of CSNS/RCS |
10.18429/JACoW-HB2018-WEP2PO017 | Study on the Leakage Fields of the Septum and Lambertson Magnets during the Beam Commissioning |
10.18429/JACoW-HB2018-WEP2PO018 | Magnetic Field Tracking at CSNS/RCS |
10.18429/JACoW-HB2018-WEP2PO022 | Study on the Phase Space Painting Injection during the Beam Commissioning for CSNS |
10.18429/JACoW-HB2018-WEP2PO023 | Timing Adjustment of Eight Kickers and a Method to Calibrate the Kicker Current Curves During the Beam Commissioning for CSNS |