Author: Steinhagen, R.J.
Paper Title Page
TUA2WD01 FAIR Commissioning - Concepts and Strategies in View of High-Intensity Operation 141
 
  • R.J. Steinhagen
    GSI, Darmstadt, Germany
 
  The Facility for Anti-Proton and Ion Research (FAIR) presently under construction, extends and supersedes GSI's existing infrastructure. Its core challenges include the precise control of highest proton and uranium ion beam intensities, the required extreme high vacuum conditions, machine protection and activation issues while providing a high degree of multi-user mode of operation with facility reconfiguration on time-scales of a few times per week. Being based on best-practices at other laboratories, this contribution outlines the applicable hardware and beam commissioning strategies, as well as concepts, beam-based and other accelerator systems that are being tested at the existing facility in view of the prospective FAIR operation.  
slides icon Slides TUA2WD01 [10.735 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-HB2018-TUA2WD01  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)