Author: Li, Y.
Paper Title Page
TUA1WD03 Commissioning Status and Plans of CSNS/RCS 133
 
  • S.Y. Xu, Y.W. An, J. Chen, M.Y. Huang, H.F. Ji, Y. Li, S. Wang
    IHEP, Beijing, People's Republic of China
  • X.H. Lu
    CSNS, Guangdong Province, People's Republic of China
 
  The China Spallation Neutron Source (CSNS) is an accelerator-based science facility. CSNS is designed to accelerate proton beam pulses to 1.6 GeV kinetic energy, striking a solid metal target to produce spallation neutrons. CSNS has two major accelerator systems, a linear accelerator (80 MeV Linac) and a 1.6 GeV rapid cycling synchrotron (RCS). The Beam commissioning of CSNS has been commissioned recently. Beam had been accelerated to 61 MeV at CSNS/Linac on April 24, 2017, and 1.6 GeV acceleration at CSNS/RCS was successfully accomplished on July 7, 2017 with the injection energy of 61 MeV. Beam had been accelerated to 80 MeV at CSNS/Linac on January 6, 2018, and 1.6 GeV acceleration at CSNS/RCS was successfully accomplished on January 18, 2018 with the injection energy of 80 MeV. The initial machine parameter tuning and various beam studies were completed. In this paper, the commissioning experiences are introduced.  
slides icon Slides TUA1WD03 [10.794 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-HB2018-TUA1WD03  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)