DOI | Title |
---|---|
doi:10.18429/JACoW-HB2016-MOPM4P01 | Challenges and Performance of the C-ADS Injector System |
doi:10.18429/JACoW-HB2016-MOPR002 | Study on the Magnetic Measurement Results of the Injection System for CSNS/RCS |
doi:10.18429/JACoW-HB2016-MOPR017 | Status of the Beam Instrumentation System of CSNS |
doi:10.18429/JACoW-HB2016-MOPR018 | XAL Applications Development for CSNS Transport Lines |
doi:10.18429/JACoW-HB2016-MOPL005 | The Simulation Study of Beam Dynamics for CSNS Linac During Beam Commissioning |
doi:10.18429/JACoW-HB2016-MOPL006 | Beam Dynamics Study of C-Ads Injector-I With Developing P-Topo Code |
doi:10.18429/JACoW-HB2016-MOPL024 | Study of Magnets Sorting of the CSNS/RCS Dipoles and Quadrupoles* |
doi:10.18429/JACoW-HB2016-TUPM2Y01 | Beam Commissioning Results for the CSNS MEBT and DTL-1 |
doi:10.18429/JACoW-HB2016-TUPM6Y01 | Commissioning of C-ADS Injector I |
doi:10.18429/JACoW-HB2016-WEPM7X01 | The Application of the Optimization Algorithm in the Collimation System for CSNS/RCS |
doi:10.18429/JACoW-HB2016-WEAM2Y01 | Overview of the CSNS Linac LLRF and Operational Experiences During Beam Commissioning |
doi:10.18429/JACoW-HB2016-THAM1Y01 | Beam Commissioning of C-ADS Linac Instrumentation |