ESS
Zamudio, Spain
DOI Title
doi:10.18429/JACoW-HB2016-MOAM3P30 The ESS Accelerator
doi:10.18429/JACoW-HB2016-MOPL015 Effect of Beam Losses on Wire Scanner Scintillator Readout, Hypothesis and Preliminary Results
doi:10.18429/JACoW-HB2016-MOPL016 Effects of Energy Deposition Models and Conductive Cooling on Wire Scanner Thermal Load, Analytical and Finite Element Analysis Approach
doi:10.18429/JACoW-HB2016-MOPL017 High Power and High Duty Cycle Slit and Grid System for Hadron Accelerator Commissioning
doi:10.18429/JACoW-HB2016-MOPL018 Scintillator Detectors for the ESS High Energy Wire Scanner
doi:10.18429/JACoW-HB2016-MOPL025 Transient Beam Loading Based Calibration for Cavity Phase and Amplitude Setting
doi:10.18429/JACoW-HB2016-TUAM3Y01 Beam Dynamics Challenges in the ESS Linac
doi:10.18429/JACoW-HB2016-TUPM5Y01 ESS Linac Plans for Commissioning and Initial Operations
doi:10.18429/JACoW-HB2016-WEAM4Y01 Design and Prototyping of the Spoke Cyromodule for ESS
doi:10.18429/JACoW-HB2016-THAM4X01 Investigation to Improve Efficiency and Availability in Control and Operation of Superconducting Cavity at ESS
doi:10.18429/JACoW-HB2016-THAM6Y01 Simulations and Detector Technologies for the Beam Loss Monitoring System at the ESS Linac