DOI | Title |
---|---|
doi:10.18429/JACoW-HB2016-MOAM3P30 | The ESS Accelerator |
doi:10.18429/JACoW-HB2016-MOPL015 | Effect of Beam Losses on Wire Scanner Scintillator Readout, Hypothesis and Preliminary Results |
doi:10.18429/JACoW-HB2016-MOPL016 | Effects of Energy Deposition Models and Conductive Cooling on Wire Scanner Thermal Load, Analytical and Finite Element Analysis Approach |
doi:10.18429/JACoW-HB2016-MOPL017 | High Power and High Duty Cycle Slit and Grid System for Hadron Accelerator Commissioning |
doi:10.18429/JACoW-HB2016-MOPL018 | Scintillator Detectors for the ESS High Energy Wire Scanner |
doi:10.18429/JACoW-HB2016-MOPL025 | Transient Beam Loading Based Calibration for Cavity Phase and Amplitude Setting |
doi:10.18429/JACoW-HB2016-TUAM3Y01 | Beam Dynamics Challenges in the ESS Linac |
doi:10.18429/JACoW-HB2016-TUPM5Y01 | ESS Linac Plans for Commissioning and Initial Operations |
doi:10.18429/JACoW-HB2016-WEAM4Y01 | Design and Prototyping of the Spoke Cyromodule for ESS |
doi:10.18429/JACoW-HB2016-THAM4X01 | Investigation to Improve Efficiency and Availability in Control and Operation of Superconducting Cavity at ESS |
doi:10.18429/JACoW-HB2016-THAM6Y01 | Simulations and Detector Technologies for the Beam Loss Monitoring System at the ESS Linac |