DOI | Title |
---|---|
doi:10.18429/JACoW-HB2016-MOPR017 | Status of the Beam Instrumentation System of CSNS |
doi:10.18429/JACoW-HB2016-MOPR018 | XAL Applications Development for CSNS Transport Lines |
doi:10.18429/JACoW-HB2016-MOPL005 | The Simulation Study of Beam Dynamics for CSNS Linac During Beam Commissioning |
doi:10.18429/JACoW-HB2016-MOPL024 | Study of Magnets Sorting of the CSNS/RCS Dipoles and Quadrupoles* |
doi:10.18429/JACoW-HB2016-TUPM2Y01 | Beam Commissioning Results for the CSNS MEBT and DTL-1 |
doi:10.18429/JACoW-HB2016-WEAM2Y01 | Overview of the CSNS Linac LLRF and Operational Experiences During Beam Commissioning |