Author: Ye, Q.
Paper Title Page
TUPM6Y01 Commissioning of C-ADS Injector I 348
 
  • J.S. Cao, H. Geng, R.L. Liu, C. Meng, Y.F. Sui, F. Yan, Q. Ye
    IHEP, Beijing, People's Republic of China
 
  As a test facility, the design goal of C-ADS Injector I is a 10mA, 10MeV CW proton linac, which uses a 3.2MeV normal conducting RFQ and superconducting single-spoke cavities for accelerating. The RF frequency of C-ADS Injector I accelerator is 325 MHz. In accordance to the progress of construction and considering the technical difficulties, the beam commissioning of C-ADS Injector I is carried out in 3 phases: Phase 1, with ECRIS + LEBT + RFQ + MEBT + TCM (two superconducting cavities), to reach 3.6 MeV; Phase 2, with ECRIS + LEBT + RFQ + MEBT + CM1 (seven superconducting cavities), to reach 5 MeV; Phase 3, with ECRIS + LEBT + RFQ + MEBT + CM1+ CM2 (same as CM1), to finally achieve the design goal of C-ADS Injector I. This paper summarizes the beam commissioning in 3 phases and focusing on the third phase.  
slides icon Slides TUPM6Y01 [3.617 MB]  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THAM1Y01 Beam Commissioning of C-ADS Linac Instrumentation 529
 
  • Y.F. Sui, J.S. Cao, J. He, H.Z. Ma, L. Wang, S.J. Wei, Q. Ye, L. Yu, J.H. Yue, X.Y. Zhao, Y. Zhao
    IHEP, Beijing, People's Republic of China
 
  Funding: Work supported by China ADS Project (XDA03020000) and the National Natural Science Foundation of China (NO. 11205172, NO. 11475204).
The China Accelerator Driven Subcritical system (C-ADS) linac, which is composed of an ECR ion source, a low energy beam transport line (LEBT), a radio frequency quadrupole accelerator (RFQ), a medium energy beam transport line (MEBT) and cryomodules with SRF cavities to boost the energy up to 10 MeV. The injector linac will be equipped with beam diagnostics to measure the beam position, the transverse profile and emittance, the beam phase as well as beam current and beam losses. Though many are conventional design, They can provide efficient operation of drive linac. This paper gives an overview and detail in beam commissioning of C-ADS linac beam instrumentation.
 
slides icon Slides THAM1Y01 [7.594 MB]  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)