Paper | Title | Page |
---|---|---|
THAM6X01 | The Path to 1 MW: Beam Loss Control in the J-PARC 3-GeV RCS | 480 |
|
||
The J-PARC 3-GeV RCS started 1-MW beam test from October 2014, and successfully achieved a 1-MW beam acceleration in January 2015. The most important issues in realizing such a high power routine beam operation are control and minimization of beam loss. This talk will present the recent progress of 1-MW beam tuning, especially focusing on our approaches to beam loss issues. | ||
![]() |
Slides THAM6X01 [1.849 MB] | |
Export • | reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |