MOPR017 Status of the Beam Instrumentation System of CSNS 95
 
  • J.L. Sun, J. Peng, R.Y. Qiu, T. Yang
    CSNS, Guangdong Province, People's Republic of China
  • W.L. Huang, F. Li, P. Li, M. Meng, J.M. Tian, T.G. Xu, Zh.H. Xu, L. Zeng
    IHEP, Beijing, People's Republic of China
 
  The first section DTL commissioning of China Spallation Neutron Source (CSNS) project has been successful finished in January, 2016. The H beam can be accelerated to 21.6 MeV at peak current 18 mA, achieved the design point. Different elements of the beam instrumentation system have been tested during the commissioning, including BPM, CT, FCT, WS, EM, BLM, and corresponding electronics and control systems. High accuracy phase measurement (precision @ ±1°) system has been started into operation. Beam loss monitor (BLM) for low energy, 3 MeV to 21.6 MeV, has been tested too, and got very positive results. For the LRBT, RCS and RTBT, different type wire scanner, BPM, WCM, CT were designed. The monitors fit for the high-radiation environments were considered. All the physical design work has been finished, and being manufactured. Lab test will be started in June and the LINAC commissioning (beam energy up to 80 MeV) will be started in August.  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)