  The European Spallation Source will be the worlds brightest neutron source. It will be driven by a 5~MW proton linac that delivers a 2.86~ms pulse at 14~Hz, which means the peak beam power is 125~MW. This requires a careful design of the lattice structures in order to allow for safe and reliable operation of the accelerator. We will discuss some of the design choices and some of the particular challenges that were faced during the design of the ESS lattice.  
slides icon Slides TUAM3Y01 [4.203 MB]  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPM5Y01 ESS Linac Plans for Commissioning and Initial Operations 342
 
  • R. Miyamoto, M. Eshraqi, M. Muñoz
    ESS, Lund, Sweden
 
  Beam commissioning of the proton linac of the European Spallation Source (ESS) is planned to be conducted in 2018 and 2019. At this stage, the last 21 cryomodules are not yet installed and the maximum beam energy and power are 570 MeV and 1.4 MW, with respect to the nominal 2 GeV and 5 MW. The linac will be operated in this condition until the remaining cyromodules are installed in two stages in 2021 and 2022. On top of the common challenges of beam dynamics and machine protection, commissioning of a large scale machine, such as the ESS linac within a relatively short integrated time of less than 40 weeks imposes an additional challenge to the scheduling and planning. This paper lays out the current plans of the ESS linac for its beam commissioning as well as the initial operation.  