Paper |
Title |
Page |
TUPM6Y01 |
Commissioning of C-ADS Injector I |
348 |
|
- J.S. Cao, H. Geng, R.L. Liu, C. Meng, Y.F. Sui, F. Yan, Q. Ye
IHEP, Beijing, People's Republic of China
|
|
|
As a test facility, the design goal of C-ADS Injector I is a 10mA, 10MeV CW proton linac, which uses a 3.2MeV normal conducting RFQ and superconducting single-spoke cavities for accelerating. The RF frequency of C-ADS Injector I accelerator is 325 MHz. In accordance to the progress of construction and considering the technical difficulties, the beam commissioning of C-ADS Injector I is carried out in 3 phases: Phase 1, with ECRIS + LEBT + RFQ + MEBT + TCM (two superconducting cavities), to reach 3.6 MeV; Phase 2, with ECRIS + LEBT + RFQ + MEBT + CM1 (seven superconducting cavities), to reach 5 MeV; Phase 3, with ECRIS + LEBT + RFQ + MEBT + CM1+ CM2 (same as CM1), to finally achieve the design goal of C-ADS Injector I. This paper summarizes the beam commissioning in 3 phases and focusing on the third phase.
|
|
|
Slides TUPM6Y01 [3.617 MB]
|
|
Export • |
reference for this paper to
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|