TUPM7X01 An Experimental Plan for 400 MeV H Stripping to Proton by Using Only Lasers in the J-PARC RCS 310
 
  • P.K. Saha, H. Harada, S. Kato, M. Kinsho
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
  • Y. Irie, I. Yamane
    KEK, Ibaraki, Japan
 
  The 3-GeV RCS (Rapid Cycling Synchrotron) of J-PARC is gradually approaching to the design operation with 1 MW beam power. Studies are ongoing for further higher beam power of 1.5 MW. The injection and extraction energy of RCS is 0.4 and 3 GeV, respectively. Lifetime of the stripper foil is the highest concern beyond 1 MW beam power. We have also already started detail studies of H stripping to protons by using lasers. However, in order to avoid high magnetic field required in the process of laser-assisted H stripping to protons, especially for lower H energies, we are studying the possibilities of using only laser system for 400 MeV H beam in the RCS. The method is a three step process, similar to that of SNS but lasers are used instead of high field magnets in the 1st (H to H0) and 3rd step (H0* to p). A Nd:YAG laser can be properly used for both 1st and 3rd steps, where commercially available powerful Excimer laser will be used an H0 excitation in the 2nd step. Although detail R&D studies are necessary to reach to the ultimate goal, we plan to carry out an experiment in 2017. A detail of the present method, experimental schedule and the expected outcome will be presented.  
slides icon Slides TUPM7X01 [3.316 MB]  
Export • reference for this paper to ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THAM6X01 The Path to 1 MW: Beam Loss Control in the J-PARC 3-GeV RCS 480
 
  • H. Hotchi, H. Harada, S. Kato, M. Kinsho, K. Okabe, P.K. Saha, Y. Shobuda, F. Tamura, N. Tani, Y. Watanabe, K. Yamamoto, M. Yamamoto, M. Yoshimoto
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken, Japan
 
  The J-PARC 3-GeV RCS started 1-MW beam test from October 2014, and successfully achieved a 1-MW beam acceleration in January 2015. The most important issues in realizing such a high power routine beam operation are control and minimization of beam loss. This talk will present the recent progress of 1-MW beam tuning, especially focusing on our approaches to beam loss issues.  