WEO2B03 Design Status of the PEFP RCS 477
 
  • J.-H. Jang, Y.-S. Cho, H.S. Kim, H.-J. Kwon
    KAERI, Daejon
  • Y.Y. Lee
    BNL, Upton, Long Island, New York
 
 

The 100-MeV proton linac of the proton engineering frontier project (PEFP) can be used as an injector of a rapid cycling synchrotron (RCS). The design study of the RCS is in process. The main purpose of the RCS is a spallation neutron source. The initial beam power is 60 kW where the injection and extraction energies are 100 MeV and 1 GeV, respectively. It will be extended to 500 kW through the upgrades of the injection energy to 200 MeV, the extraction energy to 2-GeV, and the repetition rate from 15 Hz to 30 Hz. The slow extraction option is also included in the design for basic and applied science researches. This work summarized the present design status of the PEFP RCS.

 