Paper |
Title |
Page |
TU4P19 |
Evolution of Equilibrium Parameters Ramp Including Collective Effects in the Diamond-II Booster |
120 |
|
- R. Husain, R.T. Fielder, I.P.S. Martin
DLS, Oxfordshire, United Kingdom
- P. Burrows
Oxford University, Physics Department, Oxford, Oxon, United Kingdom
|
|
|
Efficient top-up injection into the Diamond-II storage ring will require upgrading the booster lattice for a beam emittance of <20 nm rad and a bunch length of <40 ps, including when operating with high single-bunch charge. The small vacuum chamber dimensions will drive the resistive wall instability and may adversely affect equilibrium parameters along the beam energy ramp. In addition, various diagnostic and vacuum chamber components will generate geometric impedances which may further disrupt the equilibrium parameters. Based on the detailed engineering designs, impedance models of the major components have been simulated using CST Studio and included in ELEGANT tracking simulations of the booster. In addition, the effects of synchrotron radiation emission and intra-beam scattering on the equilibrium parameters during the ramp are studied.
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-FLS2023-TU4P19
|
|
About • |
Received ※ 22 August 2023 — Revised ※ 28 August 2023 — Accepted ※ 30 August 2023 — Issued ※ 02 December 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TU4P20 |
Simulated Commissioning for Diamond-II Storage Ring from On-axis to Off-axis Injection |
124 |
|
- H.-C. Chao, I.P.S. Martin
DLS, Oxfordshire, United Kingdom
|
|
|
The Diamond-II storage ring commissioning simulations have continued based on the previous results where on-axis injected beams are captured. The next goal is to enlarge the dynamic aperture so that off-axis injection can be achieved. The procedures include beam based alignment, beta-beating correction and linear optics correction. Details of the implementations are discussed and the simulation results are presented. In the end, we are able to reach off-axis injection which allows accumulation.
|
|
DOI • |
reference for this paper
※ doi:10.18429/JACoW-FLS2023-TU4P20
|
|
About • |
Received ※ 22 August 2023 — Revised ※ 30 August 2023 — Accepted ※ 31 August 2023 — Issued ※ 02 December 2023 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|