Author: Pedrozzi, M.
Paper Title Page
WEP036 The PolariX-TDS Project: Bead-Pull Measurements and High-Power Test on the Prototype 396
 
  • P. Craievich, M. Bopp, H.-H. Braun, A. Citterio, R. Ganter, T. Kleeb, F. Marcellini, M. Pedrozzi, E. Prat, S. Reiche
    PSI, Villigen PSI, Switzerland
  • R.W. Aßmann, F. Christie, R.T.P. D’Arcy, U. Dorda, M. Foese, P. Gonzalez Caminal, M. Hoffmann, M. Hüning, R. Jonas, O. Krebs, S. Lederer, V. Libov, B. Marchetti, D. Marx, J. Osterhoff, M. Reukauff, H. Schlarb, S. Schreiber, G. Tews, M. Vogt, A. Wagner
    DESY, Hamburg, Germany
  • N. Catalán Lasheras, A. Grudiev, G. McMonagle, W.L. Millar, S. Pitman, K.T. Szypula, W. Wuensch, V. del Pozo Romano
    CERN, Meyrin, Switzerland
  • W.L. Millar
    Cockcroft Institute, Warrington, Cheshire, United Kingdom
 
  A collaboration between DESY, PSI and CERN has been established to develop and build an advanced modular X- band transverse deflection structure (TDS) system with the new feature of providing variable polarization of the deflecting force. The prototype of the novel X-band TDS, the Polarizable X-band (PolariX) TDS, was fabricated at PSI following the high-precision tuning-free production process developed for the C-band Linac of the SwissFEL project. Bead-pull RF measurements were also performed at PSI to verify, in particular, that the polarization of the dipole fields does not have any rotation along the structure. The high-power test was performed at CERN and now the TDS is at DESY and has been installed in FLASHForward, where the first streaking experience with beam will be accomplished. We summarize in this paper the status of the project, the results of the bead-pull measurements and the high power test.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-FEL2019-WEP036  
About • paper received ※ 21 August 2019       paper accepted ※ 26 August 2019       issue date ※ 05 November 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEP037 RF Jitter and Electron Beam Stability in the SwissFEL Linac 400
 
  • Z.G. Geng, J. Alex, V.R. Arsov, P. Craievich, C.H. Gough, R. Kalt, T. Lippuner, F. Löhl, M. Pedrozzi, E. Prat, S. Reiche
    PSI, Villigen PSI, Switzerland
 
  The X-ray FEL machine SwissFEL at the Paul Scherrer Institut in Switzerland is commissioned and transiting to user operation smoothly. FEL operation requires stringent requirements for the beam stability at the linac output, such as the electron bunch arrival time, peak current and energy. Among other things, a highly stable RF system is required to guarantee the beam stability. The SwissFEL RF system is designed based on the state-of-the-art technologies that have allowed achieving excellent RF stability. The propagation of RF amplitude and phase jitter to the electron beam are analyzed theoretically and compared with the measurements performed at SwissFEL.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-FEL2019-WEP037  
About • paper received ※ 20 August 2019       paper accepted ※ 27 August 2019       issue date ※ 05 November 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THP085 Status of Athos, the Soft X-Ray FEL Line of SwissFEL 753
 
  • R. Ganter, G. Aeppli, A. Al Haddad, J. Alex, C. Arrell, V.R. Arsov, S. Bettoni, C. Bostedt, H.-H. Braun, M. Calvi, T. Celcer, P. Craievich, R. Follath, F. Frei, N. Gaiffi, Z.G. Geng, C.H. Gough, M. Huppert, R. Ischebeck, H. Jöhri, P.N. Juranič, B. Keil, F. Löhl, F. Marcellini, G. Marinkovic, G.L. Orlandi, C. Ozkan Loch, M. Paraliev, L. Patthey, M. Pedrozzi, C. Pradervand, E. Prat, S. Reiche, T. Schietinger, T. Schmidt, K. Schnorr, C. Svetina, A. Trisorio, C. Vicario, D. Voulot, U.H. Wagner, A.C. Zandonella
    PSI, Villigen PSI, Switzerland
 
  The Athos line will cover the photon energy range from 250 to 1900 eV and will operate in parallel to the hard X-ray line Aramis of SwissFEL. The paper will describe the current layout of the Athos FEL line starting from the fast kicker magnet followed by the dogleg transfer line, the small linac and the 16 APPLE undulators. From there the photon beam passes through the photonics front end and the beamline optics before reaching the experimental stations AMO and FURKA. The focus of this contribution will be on the two bunch operation commissioning (two bunches in the same RF macropulse), which started in 2018, and the characterization of the major components like the APPLE X undulator UE38, the CHIC chicane and the dechirper. The Athos installation inside the tunnel is alternating with Aramis FEL user operation and the first lasing is planned for winter 2019 / 2020.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-FEL2019-THP085  
About • paper received ※ 30 July 2019       paper accepted ※ 28 August 2019       issue date ※ 05 November 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)