Author: Gough, C.H.
Paper Title Page
WEP037 RF Jitter and Electron Beam Stability in the SwissFEL Linac 400
 
  • Z.G. Geng, J. Alex, V.R. Arsov, P. Craievich, C.H. Gough, R. Kalt, T. Lippuner, F. Löhl, M. Pedrozzi, E. Prat, S. Reiche
    PSI, Villigen PSI, Switzerland
 
  The X-ray FEL machine SwissFEL at the Paul Scherrer Institut in Switzerland is commissioned and transiting to user operation smoothly. FEL operation requires stringent requirements for the beam stability at the linac output, such as the electron bunch arrival time, peak current and energy. Among other things, a highly stable RF system is required to guarantee the beam stability. The SwissFEL RF system is designed based on the state-of-the-art technologies that have allowed achieving excellent RF stability. The propagation of RF amplitude and phase jitter to the electron beam are analyzed theoretically and compared with the measurements performed at SwissFEL.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-FEL2019-WEP037  
About • paper received ※ 20 August 2019       paper accepted ※ 27 August 2019       issue date ※ 05 November 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEP038 Commissioning and Stability Studies of the SwissFEL Bunch-Separation System 404
 
  • M. Paraliev, S. Dordevic, R. Ganter, C.H. Gough, N. Hiller, R.A. Krempaská, D. Voulot
    PSI, Villigen PSI, Switzerland
 
  SwissFEL is a linear electron accelerator based, X-ray Free Electron Laser at the Paul Scherrer Institute, Switzerland. It is a user oriented facility capable of producing short, high brightness X-ray pulses covering the spectral range from 1 to 50 Å. SwissFEL is designed to run in two electron bunch mode in order to serve simultaneously two experimental beamline stations (hard and soft X-ray one) at its full repetition rate. Two closely spaced (28 ns) electron bunches are accelerated in one RF macro pulse up to 3 GeV. A high stability resonant kicker system and a Lambertson septum magnet are used to separate the bunches and to send them to their respective beamlines. With the advancement of the construction of the second beamline (Athos) the bunch-separation system was successfully commissioned. In order to confirm that the beam separation process is fully transparent a stability study of the electron beam and the free electron laser in the main beamline (Aramis) was done.  
poster icon Poster WEP038 [0.945 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-FEL2019-WEP038  
About • paper received ※ 19 August 2019       paper accepted ※ 25 August 2019       issue date ※ 05 November 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THP085 Status of Athos, the Soft X-Ray FEL Line of SwissFEL 753
 
  • R. Ganter, G. Aeppli, A. Al Haddad, J. Alex, C. Arrell, V.R. Arsov, S. Bettoni, C. Bostedt, H.-H. Braun, M. Calvi, T. Celcer, P. Craievich, R. Follath, F. Frei, N. Gaiffi, Z.G. Geng, C.H. Gough, M. Huppert, R. Ischebeck, H. Jöhri, P.N. Juranič, B. Keil, F. Löhl, F. Marcellini, G. Marinkovic, G.L. Orlandi, C. Ozkan Loch, M. Paraliev, L. Patthey, M. Pedrozzi, C. Pradervand, E. Prat, S. Reiche, T. Schietinger, T. Schmidt, K. Schnorr, C. Svetina, A. Trisorio, C. Vicario, D. Voulot, U.H. Wagner, A.C. Zandonella
    PSI, Villigen PSI, Switzerland
 
  The Athos line will cover the photon energy range from 250 to 1900 eV and will operate in parallel to the hard X-ray line Aramis of SwissFEL. The paper will describe the current layout of the Athos FEL line starting from the fast kicker magnet followed by the dogleg transfer line, the small linac and the 16 APPLE undulators. From there the photon beam passes through the photonics front end and the beamline optics before reaching the experimental stations AMO and FURKA. The focus of this contribution will be on the two bunch operation commissioning (two bunches in the same RF macropulse), which started in 2018, and the characterization of the major components like the APPLE X undulator UE38, the CHIC chicane and the dechirper. The Athos installation inside the tunnel is alternating with Aramis FEL user operation and the first lasing is planned for winter 2019 / 2020.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-FEL2019-THP085  
About • paper received ※ 30 July 2019       paper accepted ※ 28 August 2019       issue date ※ 05 November 2019  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)