Paper |
Title |
Page |
WEP037 |
RF Jitter and Electron Beam Stability in the SwissFEL Linac |
400 |
|
- Z.G. Geng, J. Alex, V.R. Arsov, P. Craievich, C.H. Gough, R. Kalt, T. Lippuner, F. Löhl, M. Pedrozzi, E. Prat, S. Reiche
PSI, Villigen PSI, Switzerland
|
|
|
The X-ray FEL machine SwissFEL at the Paul Scherrer Institut in Switzerland is commissioned and transiting to user operation smoothly. FEL operation requires stringent requirements for the beam stability at the linac output, such as the electron bunch arrival time, peak current and energy. Among other things, a highly stable RF system is required to guarantee the beam stability. The SwissFEL RF system is designed based on the state-of-the-art technologies that have allowed achieving excellent RF stability. The propagation of RF amplitude and phase jitter to the electron beam are analyzed theoretically and compared with the measurements performed at SwissFEL.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-FEL2019-WEP037
|
|
About • |
paper received ※ 20 August 2019 paper accepted ※ 27 August 2019 issue date ※ 05 November 2019 |
|
Export • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
THP085 |
Status of Athos, the Soft X-Ray FEL Line of SwissFEL |
753 |
|
- R. Ganter, G. Aeppli, A. Al Haddad, J. Alex, C. Arrell, V.R. Arsov, S. Bettoni, C. Bostedt, H.-H. Braun, M. Calvi, T. Celcer, P. Craievich, R. Follath, F. Frei, N. Gaiffi, Z.G. Geng, C.H. Gough, M. Huppert, R. Ischebeck, H. Jöhri, P.N. Juranič, B. Keil, F. Löhl, F. Marcellini, G. Marinkovic, G.L. Orlandi, C. Ozkan Loch, M. Paraliev, L. Patthey, M. Pedrozzi, C. Pradervand, E. Prat, S. Reiche, T. Schietinger, T. Schmidt, K. Schnorr, C. Svetina, A. Trisorio, C. Vicario, D. Voulot, U.H. Wagner, A.C. Zandonella
PSI, Villigen PSI, Switzerland
|
|
|
The Athos line will cover the photon energy range from 250 to 1900 eV and will operate in parallel to the hard X-ray line Aramis of SwissFEL. The paper will describe the current layout of the Athos FEL line starting from the fast kicker magnet followed by the dogleg transfer line, the small linac and the 16 APPLE undulators. From there the photon beam passes through the photonics front end and the beamline optics before reaching the experimental stations AMO and FURKA. The focus of this contribution will be on the two bunch operation commissioning (two bunches in the same RF macropulse), which started in 2018, and the characterization of the major components like the APPLE X undulator UE38, the CHIC chicane and the dechirper. The Athos installation inside the tunnel is alternating with Aramis FEL user operation and the first lasing is planned for winter 2019 / 2020.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-FEL2019-THP085
|
|
About • |
paper received ※ 30 July 2019 paper accepted ※ 28 August 2019 issue date ※ 05 November 2019 |
|