Paper | Title | Page |
---|---|---|
THP078 | Status of the CompactLight Design Study | 738 |
|
||
Funding: This project has received funding from the European Union’s Horizon 2020 Research and Innovation Programme under Grant Agreement No. 777431. CompactLight (XLS) is an International Collaboration of 24 partners and 5 third parties, funded by the European Union through the Horizon 2020 Research and Innovation Programme. The main goal of the project, which started in January 2018 with a duration of 36 months, is the design of an hard X-ray FEL facility beyond today’s state of the art, using the latest concepts for bright electron photo-injectors, high-gradient accelerating structures, and innovative short-period undulators. The specifications of the facility and the parameters of the future FEL are driven by the demands of potential users and the associated science cases. In this paper we will give an overview on the ongoing activities and the major results achieved until now. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-FEL2019-THP078 | |
About • | paper received ※ 19 August 2019 paper accepted ※ 29 August 2019 issue date ※ 05 November 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |
TUP025 | Current Status of Free Electron Laser @ TARLA | 102 |
|
||
Funding: Work supported by Strategy and Budget Department of Turkey with Grand No: 2006K120470 Turkish Accelerator and Radiation Laboratory (TARLA), which is supported by the Presidency Strategy and Budget Directorate of Turkey, aims to be the state of art research instrument for the radiation users from Turkey. Two superconducting accelerating modules of TARLA will drive two different planar undulator magnets with periods of 110 mm (U110) and 35 mm (U35) in order to generate high brightness Continuous Wave (CW) Free Electron Laser (FEL) tunable in between 5-350 µm. In addition, the linac will drive a Bremstrahlung radiation station to generate polarized gamma radiation. Main components of TARLA, such as injector, superconducting accelerating modules and cryoplant are under commissioning currently. In this study, we present current status of the facility in addition to expected FEL performance of the facility. |
||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-FEL2019-TUP025 | |
About • | paper received ※ 20 August 2019 paper accepted ※ 29 August 2019 issue date ※ 05 November 2019 | |
Export • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |