Author: Sheppard, J.C.
Paper Title Page
TUP023 Recent Developments and Plans for Two Bunch Operation with up to 1 μs Separation at LCLS 288
 
  • F.-J. Decker, K.L.F. Bane, W.S. Colocho, A.A. Lutman, J.C. Sheppard
    SLAC, Menlo Park, California, USA
 
  Funding: Work supported by U.S. Department of Energy, Contract DE-AC02-76SF00515.
To get two electron bunches with a separation of up to 1 microsecond at the Linac Coherent Light Source (LCLS) is important for LCLS-II developments. Two lasing bunches up to 220 ns have been demonstrated. Many issues have to be solved to get that separation increased by a factor of 5. The typical design and setup for one single bunch has to be questioned for many devices: RF pulse widths have to be widened, BPMs diagnostic can see only one bunch or a vector average, feedbacks have to be doubled up, the main Linac RF needs to run probably un-SLEDed, and special considerations have to be done for the Gun and L1X RF.
 
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-FEL2017-TUP023  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)