Author: Michalski, T.J.
Paper Title Page
WEIACC003 ER@CEBAF, a 7 GeV, 5-Pass, Energy Recovery Experiment 58
 
  • F. Méot, I. Ben-Zvi, Y. Hao, C. Liu, M.G. Minty, V. Ptitsyn, G. Robert-Demolaize, T. Roser, P. Thieberger, N. Tsoupas, C. Xu, W. Xu
    BNL, Upton, Long Island, New York, USA
  • M.E. Bevins, S.A. Bogacz, D. Douglas, C.J. Dubbé, T.J. Michalski, Y. Roblin, T. Satogata, M. F. Spata, C. Tennant, M.G. Tiefenback
    JLab, Newport News, Virginia, USA
 
  Funding: Work supported by Brookhaven Science Associates, LLC under Contract DE-AC02-98CH10886 with the U.S. DOE, Jefferson Science Associates, LLC under Contract DE-AC05-06OR23177 with the U.S. DOE.
A multiple-pass, high energy Energy Recovery Linac experiment at the JLab CEBAF will be instrumental in providing necessary information and technology testing for a number of possible future applications and facilities such as Linac-Ring based colliders, which have been designed at BNL (eRHIC) and CERN (LHeC), and also drivers for high-energy FELs and 4th GLS. The project has been submitted to, and has received approval from, JLab Program Advisory Committee (PAC 44) in July 2016. Since it was launched 2+ years ago, it has progressed in defining the experimental goals, including for instance multiple-beam instrumentation, ER efficiency, BBU, and the necessary modifications to CEBAF lattice, including for instance a 4-dipole phase chicane in recirculation Arc A, a dump line, and new linac optics. End-to-end simulations have been undertaken and software tools are under development. A next major objective in demonstrating readiness is a technical review as mandated by PAC 44. This paper gives a status of the project and its context, and presents plans for the near future.
 
slides icon Slides WEIACC003 [5.323 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-ERL2017-WEIACC003  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)