Author: Shiltsev, V.D.
Paper Title Page
MOXAT0106 Realization, Timeline, Challenges and Ultimate Limits of Future Colliders 19
 
  • V.D. Shiltsev
    Fermilab, Batavia, Illinois, USA
 
  Funding: This manuscript has been authored by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the U.S. Department of Energy, Office of Science, Office of High Energy Physics
We present a summary of the Snowmass’21 Accelerator Frontier discussions on the future collider facilities for HEP and possible implementation scenarios and challenges. The main findings of the Implementation Task Force on the required R&D duration and construction cost will be discussed. We also take a look into the possible limits of ultimate colliders in terms of energy, luminosity, size, cost, power, and timeline.
 
slides icon Slides MOXAT0106 [7.602 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-eeFACT2022-MOXAT0106  
About • Received ※ 21 September 2022 — Revised ※ 03 February 2023 — Accepted ※ 08 February 2023 — Issue date ※ 15 February 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
FRXAS0101 Power Budgets and Performance Considerations for Future Higgs Factories 256
 
  • F. Zimmermann
    CERN, Meyrin, Switzerland
  • S.A. Belomestnykh, V.D. Shiltsev
    Fermilab, Batavia, Illinois, USA
  • M.E. Biagini, M. Boscolo
    LNF-INFN, Frascati, Italy
  • A. Faus-Golfe
    Université Paris-Saclay, CNRS/IN2P3, IJCLab, Orsay, France
  • J. Gao
    IHEP, Beijing, People’s Republic of China
  • M. Koratzinos
    PSI, Villigen PSI, Switzerland
  • B. List
    DESY, Hamburg, Germany
  • V. Litvinenko
    Stony Brook University, Stony Brook, USA
  • E.A. Nanni, P. Raimondi, T.O. Raubenheimer, J.T. Seeman
    SLAC, Menlo Park, California, USA
  • K. Oide
    DPNC, Genève, Switzerland
  • R.A. Rimmer, T. Satogata
    JLab, Newport News, Virginia, USA
 
  Funding: Work supported by the European Union’s H2020 Framework Programme under grant agreement no. 951754 (FCCIS), and by Fermi Research Alliance, LLC, under contract No. De-AC02-07CH11359 with the US DoE.
A special session at eeFACT’22 reviewed the electrical power budgets and luminosity risks for eight proposed future Higgs and electroweak factories (CCC, CEPC, CERC, CLIC, FCC-ee, HELEN, ILC, and RELIC) and, in comparison, for a lepton-hadron collider (EIC) presently under construction. We report highlights of presentations and discussions.
 
slides icon Slides FRXAS0101 [1.291 MB]  
DOI • reference for this paper ※ doi:10.18429/JACoW-eeFACT2022-FRXAS0101  
About • Received ※ 16 January 2023 — Revised ※ 04 February 2023 — Accepted ※ 08 February 2023 — Issue date ※ 10 February 2023
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)