WEZAS0202 |
SuperKEKB Beam Instabilities Challenges and Experience |
202 |
|
- H. Ikeda, H. Fukuma, T. Kobayashi, T. Mimashi, T.M. Mitsuhashi, G. Mitsuka, S. Sasaki, M. Tobiyama
KEK, Ibaraki, Japan
|
|
|
KEKB was upgraded from 2011 over 5 years in order to increase the luminosity and started SuperKEKB commissioning in 2018 after the test operation. In order to cope with large beam currents and small beam sizes, various updates have been applied to the beam instrumentation system. This talk summarizes the performance of beam instrumentation in SuperKEKB Phase-III and challenges to it.
|
|
|
Slides WEZAS0202 [7.068 MB]
|
|