Author: Liu, W.B.
Paper Title Page
WEZAS0104
Commissioning of the Top-up Injection in the Collision Operation of BEPCII  
 
  • C.H. Yu, W.B. Liu, X.T. Wu, J. Xing, G.L. Xu, Y. Zhang
    IHEP, Beijing, People’s Republic of China
 
  BEPCII is designed not only for synchrotron radiation light source but also a collider. Topup operation for the synchrotron radiation facility has been realized in 2015. In order to improve the integral luminosity during the data taking of high energy physics, BEPCII began the dedicated upgrade to realize topup operation for the collider from the beginning of 2017. The modification of hardware devices have been finished at the end of 2019. The commissioning of the topup injection in the collision operation of BEPCII will be introduced in detail in this paper.  
slides icon Slides WEZAS0104 [6.606 MB]  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)