JACoW logo

Journals of Accelerator Conferences Website (JACoW)

JACoW is a publisher in Geneva, Switzerland that publishes the proceedings of accelerator conferences held around the world by an international collaboration of editors.


BiBTeX citation export for WEZAS0203: Beam Instrumentation Challenges for FCC-ee

@inproceedings{wendt:eefact2022-wezas0203,
  author       = {M. Wendt and E. Carideo and B. Härer and U. Iriso and T. Lefèvre and S. Mazzoni and T.M. Mitsuhashi and A.-S. Müller and G. Niehues and M. Reißig and A. Schloegelhofer and M. Siano},
% author       = {M. Wendt and E. Carideo and B. Härer and U. Iriso and T. Lefèvre and S. Mazzoni and others},
% author       = {M. Wendt and others},
  title        = {{Beam Instrumentation Challenges for FCC-ee}},
% booktitle    = {Proc. eeFACT'22},
  booktitle    = {Proc. 65th ICFA Adv. Beam Dyn. Workshop High Luminosity Circular e+e- Colliders (eeFACT'22)},
  pages        = {208--217},
  eid          = {WEZAS0203},
  language     = {english},
  keywords     = {photon, electron, radiation, laser, quadrupole},
  venue        = {Frascati, Italy},
  series       = {ICFA Advanced Beam Dynamics Workshop on High Luminosity Circular e+e- Colliders},
  number       = {65},
  publisher    = {JACoW Publishing, Geneva, Switzerland},
  month        = {02},
  year         = {2022},
  issn         = {2673-7027},
  isbn         = {978-3-95450-236-3},
  doi          = {10.18429/JACoW-eeFACT2022-WEZAS0203},
  url          = {https://jacow.org/eefact2022/papers/wezas0203.pdf},
  abstract     = {{For the accelerator-based future of high energy physics at the energy frontier, CERN started to investigate a 92 km circumference Future Circular Collider (FCC), as e⁺/e⁻ collider the FCC-ee will operate at beam energies up to 182.5 GeV. Beside the machine operational aspects, beam instrumentation will play a key role in verifying and optimizing the machine to achieve the ambitious beam parameters and quality. This paper gives a brief overview of the various challenges to develop the required beam instruments, with focus on beam position, beam size and bunch length measurements, and well as an outline of the planned R&D activities.}},
}