Commissioning of Positron Damping Ring and the Beam Transport for SuperKEKB |
Authors |
- N. Iida, Y. Funakoshi, H. Ikeda, T. Ishibashi, H. Kaji, T. Kamitani, M. Kikuchi, T. Kobayashi, H. Koiso, F. Miyahara, T. Mori, Y. Ohnishi, Y. Seimiya, H. Sugimoto, H. Sugimura, R. Ueki, Y. Yano, D. Zhou
KEK, Ibaraki, Japan
|
Abstract |
The Positron Damping Ring (DR) for SuperKEKB successfully started its operation in February 2018, and the commissioning was continued until the end of SuperKEKB Phase 2 in July without serious troubles. This paper describes achievements of the beam commissioning of injection and extraction lines (LTR and RTL) between the LINAC and DR. In the LTR commissioning, the positron beam with high emittance, wide energy spread, and high charge were transported and injected into the DR. In the RTL commissioning, special cares were necessary to preserve the low emittance. The observed emittance growth in the RTL was not a problem for Phase 2, but it should be resolved in the coming Phase 3. In this paper, brief results of the commissioning of the DR is also reported.
|
Paper |
download TUPAB07.PDF [3.419 MB / 5 pages] |
Export |
download ※ BibTeX
※ LaTeX
※ Text/Word
※ RIS
※ EndNote |
Conference |
eeFACT2018 |
Series |
ICFA ABDW on High Luminosity Circular e$^+$e$^-$ Colliders (62nd) |
Location |
Hong Kong, China |
Date |
24-27 September 2018 |
Publisher |
JACoW Publishing, Geneva, Switzerland |
Editorial Board |
Ying-ying Li (HKUST, Hong Kong, China); Lu Li (IMP/CAS, Lanzhou, China); Volker RW Schaa (GSI, Darmstadt, Germany) |
Online ISBN |
978-3-95450-216-5 |
Received |
20 October 2018 |
Accepted |
19 February 2019 |
Issue Date |
21 April 2019 |
DOI |
doi:10.18429/JACoW-eeFACT2018-TUPAB07 |
Copyright |
Published by JACoW Publishing under the terms of the Creative Commons Attribution 3.0 International license. Any further distribution of this work must maintain attribution to the author(s), the published article's title, publisher, and DOI. |
|