Author: Bolzon, B.
Paper Title Page
TUP04 Commissioning of the Proton-Linac ECR Source for FAIR 82
 
  • J. Fils, R. Berezov, R. Hollinger
    GSI, Darmstadt, Germany
  • B. Bolzon, N. Chauvin, Y. Gauthier, Y. Sauce, O. Tuske
    IRFU, CEA, University Paris-Saclay, Gif-sur-Yvette, France
  • O. Delferrière
    CEA/DRF/IRFU, Gif-sur-Yvette, France
 
  The construction of the source and Low Energy Beam Transport of the future Proton-Linac for the FAIR facility in Darmstadt, Germany (Facility for Antiproton and Ion Research) is going forward at CEA-Saclay in France. The latest results of normalized emittance and of species proportions are shown at different position, directly at the source exit, between the 2 solenoids of the LEBT, and also around the theoretical focal point at RFQ entrance position. A new software for emittance treatment allows separating the different species after emittance measurement and is used to process the data. This paper presents the status of the FAIR injector commissioning at Saclay in summer 2018.  
poster icon Poster TUP04 [0.367 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-ECRIS2018-TUP04  
Export • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)