A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Zhao, L. Y.

Paper Title Page
TUPC017 Beam Instrumentation System Development and Commissioning in SSRF 1080
 
  • Y. B. Leng, J. Chen, Y. Z. Chen, Z. C. Chen, G. Q. Huang, D. K. Liu, Y. B. Yan, K. R. Ye, C. X. Yin, J. Yu, L. Y. Yu, R. Yuan, G. B. Zhao, L. Y. Zhao, W. M. Zhou, Y. Zou
    SINAP, Shanghai
 
  In recent months the first beams have been stored in the Storage Ring of the Shanghai Synchrotron Radiation Facility (SSRF). The brief introduction will be given of the beam diagnostics system development. The initial commissioning results including beam profile monitors, beam position monitors (BPMs), DC current monitors (DCCT), and synchrotron radiation monitor (SRM) will be reported in this paper.  
THPC162 The SSRF Timing System 3369
 
  • L. Y. Zhao, D. K. Liu, C. X. Yin
    SINAP, Shanghai
 
  In the Shanghai Synchrotron Radiation Facility (SSRF), various equipment in the 150MeV linac, the full energy booster and the 3.5GeV storage ring need to be triggered and synchronized by a low jitter timing system. An event system based on distribution network is implemented in the SSRF timing system. In this paper, the software and hardware structure of the SSRF timing system are described and the system performance is presented.