A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Wise, P.

Paper Title Page
MOPC144 Installation of the Front End Test Stand High Performance H- Ion Source at RAL 412
 
  • D. C. Faircloth, M. H. Bates, S. R. Lawrie, A. P. Letchford, M. Perkins, M. E. Westall, M. Whitehead, P. Wise, T. Wood
    STFC/RAL/ISIS, Chilton, Didcot, Oxon
  • C. Gabor
    STFC/RAL/ASTeC, Chilton, Didcot, Oxon
  • J. K. Pozimski, P. Savage
    Imperial College of Science and Technology, Department of Physics, London
 
  The RAL Front End Test Stand (FETS) is being constructed to demonstrate a chopped H- beam of up to 60 mA at 3 MeV with 50 pps and sufficiently high beam quality for future high-power proton accelerators (HPPA). This paper details the first stage of construction- the installation of the ion source.  
THPP029 Status of the RAL Front End Test Stand 3437
 
  • A. P. Letchford, M. A. Clarke-Gayther, D. C. Faircloth, D. J.S. Findlay, S. R. Lawrie, P. Romano, P. Wise
    STFC/RAL/ISIS, Chilton, Didcot, Oxon
  • S. M.H. Al Sari, S. Jolly, A. Kurup, D. A. Lee, P. Savage
    Imperial College of Science and Technology, Department of Physics, London
  • J. Alonso, R. Enparantza
    Fundación Tekniker, Elbr (Guipuzkoa)
  • J. J. Back
    University of Warwick, Coventry
  • F. J. Bermejo
    Bilbao, Faculty of Science and Technology, Bilbao
  • C. Gabor, D. C. Plostinar
    STFC/RAL/ASTeC, Chilton, Didcot, Oxon
  • J. Lucas
    Elytt Energy, Madrid
  • J. Pasternak, J. K. Pozimski
    STFC/RAL, Chilton, Didcot, Oxon
 
  High power proton accelerators (HPPAs) with beam powers in the several megawatt range have many applications including drivers for spallation neutron sources, neutrino factories, waste transmuters and tritium production facilities. The UK's commitment to the development of the next generation of HPPAs is demonstrated by a test stand being constructed in collaboration between RAL, Imperial College London, the University of Warwick and the Universidad del Pais Vasco, Bilbao. The aim of the RAL Front End Test Stand is to demonstrate that chopped low energy beams of high quality can be produced and is intended to allow generic experiments exploring a variety of operational conditions. This paper describes the current status of the RAL Front End Test Stand.