WEPC057 Preparation for Top-up Operation at Diamond 2121
 
  • R. P. Walker, P. T. Bonner, F. Burge, Y. S. Chernousko, C. Christou, J. A. Dobbing, M. T. Heron, V. C. Kempson, I. P.S. Martin, G. Rehm, R. J. Rushton, S. J. Singleton, M. C. Wilson
    Diamond, Oxfordshire
  • R. Bartolini
    JAI, Oxford
 
  We report on progress towards top-up operation of Diamond. We describe the extensive safety assessment that has carried out, including the measurements and simulations to assess the potential radiation doses in the case of poor injection efficiency or a top-up "accident", and the various levels of safety measures - procedures, software limits and personnel safety system interlocks - that have been implemented. We describe the top-up control algorithm, the technique used to maintain a given arbitrary filling pattern and the performance in practise. The work carried out to reduce the effect of the injection kickers on the stored beam is described, and the effect of the residual disturbance on user operation is discussed. The modifications to the timing system to provide hardware and software gating signals, and experience with the use of these, are also described.