WEPC071 | Installation and Commissioning of the 100 MeV Preinjector Linac of the New Elettra Injector | 2160 |
|
||
A new full energy injector has been installed and commissioned at Sincrotrone Trieste, the Italian Synchrotron Light Source Facility in Trieste. It consists of a 100 MeV Preinjector Linac (PL) followed by a 2.5 GeV Booster Synchrotron (BS), that will fill the Elettra Storage Ring (SR) with 2.0 GeV and 2.4 GeV electrons. Here a complete description of the preinjector linac and its characterization in terms of beam parameters will be presented and discussed. |