Paper | Title | Page |
---|---|---|
THPP105 | Beam Commissioning Results of the RCS Injection and Extraction at J-PARC | 3611 |
|
||
The beam commissioning of J-PARC (Japan Proton Accelerator Research Complex) 3 GeV RCS (Rapid Cycling Synchrotron) has been started from the end of year 2007. As injection is in the very first stage, an accurate and well controlled beam at the injection strongly related to the other part of the RCS commissioning, including extraction where, an well extracted beam directly reflects the overall commissioning result. In this paper, the beam commissioning results of the RCS injection and extraction will be reported. |