A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z  

Shirkov, G.

Paper Title Page
MOPP035 ILC Siting in Dubna Region (Russia) and ILC activity in JINR 622
 
  • G. Shirkov, Ju. Boudagov, Yu. N. Denisov, I. N. Meshkov, A. N. Sissakian, G. V. Trubnikov
    JINR, Dubna, Moscow Region
 
  The report presents the development of investigations on ILC siting in the Dubna region and ILC technical activity at JINR. Russia is one of candidates now for ILC hosting in the Dubna region. International intergovernmental status of JINR, stable geological and plain relief conditions comfortable location, well developed infrastructure create powerful advantages of JINR among other possible sites. Shallow layout of tunnels and experimental halls could significantly reduce the cost of conventional facilities and siting. Besides JINR physicists take part in several fields of activity in ILC: works on photo injector prototype, participation in design and construction of cryomodules, laser metrology, etc.  
TUPP120 Current Status of the IBA C400 Cyclotron Project for Hadron Therapy 1806
 
  • Y. Jongen, M. Abs, A. Blondin, W. J.G. M. Kleeven, D. Vandeplassche, S. Zaremba
    IBA, Louvain-la-Neuve
  • V. Aleksandrov, S. Gurskiy, G. A. Karamysheva, N. Yu. Kazarinov, S. A. Kostromin, N. A. Morozov, E. Samsonov, V. Shevtsov, G. Shirkov, E. Syresin, A. Tuzikov
    JINR, Dubna, Moscow Region
 
  Compact superconducting isochronous cyclotron C400 has been designed at IBA (Belgium) in collaboration with the JINR (Dubna). This cyclotron will be used for radiotherapy with proton, helium or carbon ions. 12C6+ and 4He2+ ions will be accelerated to 400 MeV/u energy and extracted by electrostatic deflector, H2+ ions will be accelerated to the energy 250MeV/u and extracted by stripping. We describe the parameters of the cyclotron, the current status of development work on the cyclotron systems. Reports on the status of the C400 project have been given regularly. Therefore, we will focus on the progress which has been achieved since recent reports in Cyclotron 2007 and EPAC 2006 conferences. The project will be ready to begin construction in the nearest future.